H.R. 2828 · 115th Congress

To extend the deadline for commencement of construction of a hydroelectric project.

Stage
Passed a chamber
Introduced
2017-06-08
Latest action
2017-07-19 · Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

Summary

(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.)

(Sec.1)This bill requires the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Enloe Hydroelectric Project located on the Similkameen River in Okanogan County, Washington.

Additionally, FERC shall reinstate the construction license if it is expired.